Overall equipment effectiveness (OEE, TRS in French): calculation, formula, worked example, NF E60-182 standard and software

Published on November 18, 2026

Overall equipment effectiveness, called taux de rendement synthétique (TRS) in French, measures the share of a machine's or a line's maximum theoretical output that was actually produced as good parts. It is calculated by multiplying three rates: availability, performance and quality. In France, the NF E60-182 standard defines TRS and two related indicators, TRG and TRE.

Overall equipment effectiveness: definition

TRS answers a simple question: over the time the machine was supposed to produce, how many good parts did it make compared with what it could have made? A TRS of 60% means that 40% of that time did not produce good parts.

Its value lies in its breakdown. Each rate isolates one family of losses, so the shop floor knows what to act on:

  • Availability drops with breakdowns and product or tool changeovers.
  • Performance drops with minor stops and reduced speed.
  • Quality drops with production defects and start-up losses.

These six losses are the ones Seiichi Nakajima formalised in Japan in the early 1970s, together with TPM (total productive maintenance) and OEE.

The TRS formula

TRS = availability rate × performance rate × quality rate.

Each rate relies on a breakdown of time:

  • Opening time: the time the shop is open, for example an 8-hour shift.
  • Required time: opening time minus planned stops, such as breaks or preventive maintenance, according to the plant's rules.
  • Operating time: required time minus unplanned stops (breakdowns, changeovers, adjustments).
  • Net time: the time it would have taken to make all the parts produced at the theoretical rate.
  • Useful time: the time it would have taken to make only the good parts at the theoretical rate.

Hence the three rates: availability = operating time / required time; performance = net time / operating time; quality = useful time / net time. Their product gives TRS = useful time / required time, or more simply, the number of good parts divided by the number of parts that could theoretically be made during the required time.

Calculating TRS: a worked example

A machine runs on an 8-hour shift, i.e. 480 minutes of opening time. Its theoretical rate is 60 parts per hour, one part per minute.

  • Required time: the plant deducts a 30-minute break, a planned stop. Required time: 450 minutes.
  • Availability: a 25-minute breakdown and a 20-minute changeover stop the machine. Operating time: 405 minutes. Availability: 405 / 450 = 90%.
  • Performance: the machine produces 360 parts. At the theoretical rate, this would have taken 360 minutes. Performance: 360 / 405 = 88.9%.
  • Quality: 18 parts are scrapped, leaving 342 good parts. Quality: 342 / 360 = 95%.
  • TRS: 90% × 88.9% × 95% = 76%.

The direct calculation gives the same result: 342 good parts out of 450 parts possible during the required time, i.e. 76%. Here, the first lever is performance: 45 minutes lost to minor stops and reduced speed, more than the breakdown.

The NF E60-182 standard: TRS, TRG and TRE

The AFNOR standard NF E60-182, published in May 2002 and still in force, is titled "Production equipment - Performance indicators - Overall equipment effectiveness (TRS) - Overall rate of return (TRG) - Economic rate of return (TRE)" (title translated from French). It is aimed at users and manufacturers of production equipment, and defines a method for assessing their performance. It is sold by AFNOR Éditions (€156.40 excluding VAT in digital format for three users, price read on 18/11/2026).

  • TRS relates useful time to required time.
  • TRG (taux de rendement global) relates useful time to opening time: it also counts planned stops, so it is stricter. In the example above, TRG is 342 / 480 = 71.3%.
  • TRE (taux de rendement économique) is the third indicator of the standard.

In practice, each plant sets its own rules: a break, waiting for material or preventive maintenance can be counted as a stop or removed from required time. Two comparable plants can therefore show different TRS values. What matters is to write these rules down once and keep them.

What is a good TRS?

The figure of 85% often comes up as "world-class" OEE. It comes from Seiichi Nakajima, who published it in 1984 in his book "Introduction to TPM" as a minimum to strive for, with 90% availability, 95% performance and 99% quality. He noted that all the plants rewarded in Japan for their TPM programme exceeded 85%.

This benchmark has its limits. It comes from the Japanese automotive industry of the 1970s and applies to discrete manufacturing, not to process industries. Vorne, the company behind oee.com, states that most manufacturers are closer to 60%, and that it sees more plants below 45% than above 85%. It recommends aiming for progress achievable within three or four months rather than an absolute figure, and not comparing different processes: a line that changes product ten times will have lower availability than a single-product line.

Calculating TRS in Excel

A spreadsheet is enough to start, on a pilot machine. One row per shift and per machine, with:

  • opening time, planned stops and required time;
  • each unplanned stop with its duration and cause (breakdown, changeover, adjustment, lack of material);
  • the theoretical rate, the number of parts produced and the number of good parts;
  • the three rates and the TRS, calculated by formula.

A chart of stop causes ranked by duration (Pareto) shows where to act. The limit comes quickly: manual entry misses minor stops of a few seconds, arrives a day late and takes up operators' time. That is where software takes over.

OEE software: measuring automatically

OEE software collects machine states (running, stopped, speed, parts), calculates the three rates in real time and asks the operator to qualify the cause of a stop in a few seconds. There are three approaches:

  • A device fitted to the machine: Vorne, for example, sells its XL device for a one-time cost of $4,690 and claims installation in 8 hours (vendor's website, read on 18/11/2026).
  • A direct connection to CNC controllers: Ellistat's OEE software connects to Fanuc, Siemens, Mitsubishi, Mazak, Heidenhain or Okuma machine tools without an intermediate box, classifies minor stops and integrates with the MES or ERP through an API.
  • The performance module of an MES or a supervision system: OEE is one of the functions of mes software, and data from industrial supervision can feed it, through OPC UA in particular.

Before choosing, check that the tool applies your calculation rules (required time, planned stops), that it reads your machines without heavy wiring, that the operator can qualify a stop in one action, and that the data flows back to your other tools.

How to improve your TRS

Each rate has its levers:

  • Availability: single-minute exchange of die (SMED) shortens changeovers; TPM and predictive maintenance reduce breakdowns.
  • Performance: automatic measurement reveals minor stops that never appear on a paper log.
  • Quality: statistical process control and in-process inspection reduce scrap.

TRS also tells you whether a line is really saturated before investing in a new machine, and it provides a realistic basis for production planning. The place of TRS in a broader approach is covered in our operational excellence guide.

What manufacturers said at Tech for Industry Show

At the 2026 show, Forvia explained that its data platform has 20,000 daily users, including 2,000 to 3,000 working on OEE and scrap use cases, with AI assistants built into the dashboards. Read the article

NTT DATA Business Solutions presented SAP Digital Manufacturing, whose Insights component continuously tracks OEE, downtime rate and scrap rate, with different dashboards for operators and for managers. Read the article

At Rémy Martin, a Rockwell iTRAK line changes bottle format in 15 minutes instead of half a day: a direct gain in availability. Read the article

Frequently asked questions

What is overall equipment effectiveness (TRS)?

The indicator that measures the share of a machine's theoretical output actually produced as good parts, over the time it was supposed to produce.

How do you calculate TRS?

TRS = availability × performance × quality, or more directly, good parts divided by the parts that could theoretically be made during the required time.

What is the French standard for TRS?

NF E60-182, published in May 2002, which defines TRS, TRG and TRE.

What is the difference between TRS and TRG?

TRS is calculated over required time, TRG over opening time, including planned stops. TRG is therefore lower.

What is a good TRS?

85% is Nakajima's benchmark for discrete manufacturing, but many plants are around 60%. The useful target is steady progress on your own line.

Are TRS and OEE the same thing?

Yes: OEE (overall equipment effectiveness) is the English term, calculated with the same three rates.